Progress Report on 25 Point Tribal Development Package (1999 to 2002) :

(As on 14 April, 2001)

Part I

Part II

 

1( a). 500 Junior Basic Schools in ADC area which do not have any pucca building at present would be provided with a pucca building by the year 2002 AD.

The list of 600 J.B. Schools located within ADC area has been prepared and given to DMs for construction of OBB buildings. The progress so far achieved is as below :

 

Sl.
No

 implementing
agency

1998-99

1999 -2000

2000 - 2001

 Completed

 Completed

 Target

 Completed

1.

DM, NORTH

04

21

42

05

2.

DM, DHALAI

06

07

48

13

3.

DM, WEST

37

36

22

-

4.

DM, SOUTH

-

24

21

01

5.

ADC (BADP &
OWN FUND)

61

51

-

-

Total

108

139

133

19

 

During 2000-01 Director, School Education has placed Rs.147.39 lakhs with RD Deptt. being 40% share of the cost of construction of 133 Primary School buildings in ADC area. XI Finance Commission has sanctioned 25 schools in ADC areas, this fund also placed with RD Department.

1.(b) Also 244 JB Schools of ADC which have only one teacher at present would be provided with at least another teacher by December, 1999.

Out of 244 single teacher schools, double teachers have been posted in 161 schools.

As pointed out by the C.M. officials of State Govt. as well as ADC have to ensure proper functioning of the schools under Chawmanu Inspectorate. Recently School Education Deptt. has placed services of 200 Kokborak teachers to ADC.


Back to menu



2. Six residential schools exclusively for tribal students of class VI to class XII would be set up in the State at Khumulwong, Ambassa, Kumarghat, Kanchanpur, Birchandra Manu and Karbook by the year 2001. These residential schools would be of the highest standard and would be managed by the Tripura Tribal Welfare Residential Schools Society, an autonomous body under the Tribal Welfare Department.

Progress in respect of establishment of 6 (six) Ashram / Residential Schools exclusively for tribal students of class VI to class XII is as under :

 

Sl.No.

NAME

FUND PLACED

CONSTRUCTION POSITION

1.

Khumulwong
(420 seated)

Rs. 100.00 lakhs.

Construction of main school building completed. Fund placed for Teacher Barracks, Kitchen & dining Hall.

2.

Ambassa
(300 seated)

Rs. 262.00 lakhs.

Work started, construction of School building completed up to plinth level.

3.

Kumarghat
(420 seated)

Rs.100.00 lakhs.

Tender is being finalised shortly by PWD.

4.

Kanchanpur
(100 seated)

Rs.170.40 lakhs.

Re-tender is being floated.

5.

B.C.Manu
(420 seated)

Rs. 100.00 lakhs.

Work awarded.

6.

Karbook
(100 seated)

Rs.30.80 lakhs.

Site selected.

A proposal has been sent to GOI for release of central share for Karbook. The school at Khumulwng may be started by way of providing accommodation of the students in the main school building itself pending construction of boarding. Toilets as required may be constructed for this purpose. In a meeting, decision has been taken for opening the school by June,2001.


Back to menu



3. Five schools, one in each District and two in West Tripura District, which have sizable number of tribal students and have hostel facilities would be developed as centres of excellence for promoting sports and athletics amongst the tribal students.

The following schools have been selected by the Sports Department with a view to develop them as centres of excellence for promoting sports and athletics amongst the Tribal Students:-

WEST TRIPURA DISRICT:-

1. M.T.B Girls H.S School , Agrtala.

2. Tulashikhar H.S School, Khowai.

DHALAI DISTRICT:-

3. Kulai Class XII School, Kulai.

NORTH TRIPURA DISTRICT:-

4. Kanchanpur Class XII School, Kanchanpur.

SOUTH TRIPURA DISTRICT:-

5. Chatakchari HS School, Sabroom.

Sports Department has sent a scheme amounting to Rs. 150 Lakhs to HRD and NEC for according sanction. It appears, no fund was sanctioned so far from GOI and NEC. The Secretary(Sports) informed that for construction of indoor hall at the rate of Rs20.00 lakhs for each as per recommendation of NE Taskforce for infrastructure up-gradation were approved for above 5 schools.

There is no shortage of PIs and Coaches in the above schools. However, specialised Coaches are being provided.

One Sports School was started at Agartala which includes 17 tribal students out of total strength of 30. TW Deptt. has already placed fund for Rs. 9.20 lakhs.


Back to menu



4.(a) At least one hostel for tribal students of degree Colleges would be set up in each District at Agartala,Udaipur,Kamalpur and Dharmanagar by December,2000 AD.

At Agartala 30 seated and Dharmanagar 20 seated hostels for ST degree college students have already been opened. Construction work at Udaipur is completed. Construction work at Kamalpur is nearing completion.

4 (b). In addition, one hostel for tribal women students will be set up at Agartala.

Site has been selected for 100 seated ST girls Hostel at Colonel Chowmuhani, Krishnanagar. The relevant Drawing and Designs have been approved. Construction work has been entrusted with Tripura Housing Board (canceling NPCC), accordingly fund for Rs.37.43 lakhs, out of estimated cost for Rs.80.47 lakhs has been placed.


Back to menu



5. Vocational Training centres for tribal students, one in each District at Dharmanagar, (North Tripura ), Bishramganj (West Tripura ), Udaipur (South Tripura) and Kulai (Dhalai) would be made functional by December,99. Three more Vocational Training Centres would be setup at Tulasikhar, Mandai and Rupaichari. In each of these centres, 50 tribal youth would be imparted Vocational Training per centre in important employment oriented trades with the help of Union Govt.

4 (four) Vocational Training Centres at Dharmanagar (North), Kulai (Dhalai), Bisramganj (West) and Udaipur (South) have already been made functional with a capacity of 50 each. 4(four) more vocational training centres at Tulashikhar & Mandai (West Tripura) and Bagafa & Rupaichari (South Tripura) have been completed. Training will be started immediately. A mechanism to assist past trainees should be developed for self- reliance. It is also decided that one week training on EDP should be organised by the concerned NGO for each group before the end of vocational training.

The details of ST youths so far trained in different vocational training centres are as follows :-

Sl. No. Centre 1998-99 1999-00 2000-01

1

2

3

4

5

1.

Bishramgaanj

25

50

-

2.

Udaipur

25

50

-

3.

Dharmanagar

-

50

-

4.

Kulai

25

-

50

Total

75

150

50

 Tool-kits have also been provided to the following trainees on completion of their course :-

Sl.no.

CENTRE

1998-99

1999-00

1

2

3

4

1.

Bishramgaanj

25

-

2.

Udaipur

25

-

3.

Kulai

-

23

As desired by the Chief Minister steps have already been taken for conducting survey amongst passed trainees of vocational training centres(VTC) to ascertain the employment situation of them. Position of employment situation of trained ST youths as per survey report of the DM, South is as under :-

Year

No. of trained
ST youth

Employment position

No. of unemployed

In trained trade

In other trade

1

2

3

4

5

1996-97

15

02

09

04

1998-99

04

01

-

03

 
Back to menu



6(a). Special coaching centre for Madhyamik drop-out tribal students with 100 students capacity will be setup in each District.

Special coaching centres for Madhyamik drop out tribal students have been opened in all districts details of which are as follows :-

Sl. No.

 Name of District

1998-99

1999-2000

2000-2001

No.of students

Passed

No. of students

Passed

No. of Centres

No. of students

Passed

No. of Centres

I

II

III

IV

V

VI

VII

VIII

IX

X

1.

West Tripura

378

208

971

476

24

1413

-

37

2.

South Tripura

219

15

471

367

11

310

-

07

3.

Dhalai.

24

04

110

49

04

243

-

06

4.

North Tripura

-

-

166

76

03

197

-

04

Total:

227

1718

968

42

-

54

6(b). In addition study circle for coaching of the meritorious tribal students for appearing in the examinations of class XII and the JEE will be setup in each district. Both Special Coaching Centre and Study Circle will be established by December, 99.

One study circle is functioning at Agartala. Coaching Centre and Study Circle has been opened in Districts irrespective of the number of students. Wide publicity was given on opening of the centres. Since number of students available at Kailashahar is less, DM(North) has been asked to explore whether, Study Circle can be established in any other place.

Performance of the Agartala Study Circle for last 2(two) years is as follows:-

Year

Appeared JEE

Selected

1

2

3

1999-2000

29

09

2000-2001

10

01

 One study affairs cell has been setup in the Tripura University to provide information to all students about availability of professional opportunities out side the State.

6(c). Apart from them, 100 tribal students from outlying schools will be given coaching every year at Agartala for JEE from 1999 onwards.

At Agartala coaching for JEE provided to 42 students during 1999-2000 and during 2000-01 to 76 students, out of which 24 students have got selected. During 2001-02 coaching taken up for 60 and 18 students at Hindi H.S. School and Umakanta Academy respectively.

Back to menu



7. Minimum 25 meritorious tribal students would be sent for coaching outside the State to appear in the Civil Service Examination (IAS ,IPS etc.) conducted by the UPSC with the help of Government of India.

15 ST students were sent to S. N. Das Gupta College, Delhi for coaching during the year 1998-99. After proper screening, 6 ST students (3 for IAS & 3 for MBA) have been selected and sent during the year 1999-2000 for coaching at Delhi. 1 student was sent during2000-2001. One coaching centre for the same has been opened by Bharatiya Vidya Bhavan at Agartala, where 5 ST students have undergone training during last year and 4 students during current year.

The Chief Minister has desired to take all possible efforts so that, within next 2(two) years some tribal students should qualify in Civil Service Examination.

Back to menu


8. Integrated Area Based Projects would be taken up for comprehensive development of 25 most backward tribal areas of the State.

The following 43 Special Area Based Projects were taken up:

Sl.No.

Name of project

Name ofDistrict

Present Status

I

II

III

IV

1.

Tekka Tulsi

South Tripura

on going

2.

Tulsirambari & Wangilbachai

-do-

Completed

3.

East Duluma & Paharpur

-do-

on going

4.

Birendranagar & Shibpur

-do-

Completed

5.

Kaptali

-do-

on going

6.

Kachigang

-do-

Completed

7.

Pushkarinibari & Darjeelingbari etc.

-do-

Completed

8.

Bagachatal

-do-

Completed

9.

Chelagang & Laogang

-do-

New

10.

Tulasikhar & Takchaya

West Tripura

completed

11.

North & South Padmabil and Gayamanibari

-do-

Completed

12.

Hirapur& Amarendranagar

-do-

completed

13.

Pritilata Marak Basti

-do-

Completed

14.

Bagrampara

-do-

Completed

15.

Kambukcherra

-do-

On going

16.

Atharamura

-do-

New

17.

Namanjoy,Tuichingram etc.

-do-

New

18.

Khengrai,Harbang

-do-

New

19.

Pramodenagar,Amarendranagar&Pathaliaghat

-do-

New

20.

Mulyarampara

North Tripura

Completed

21.

Sakhan Sermun

-do-

Completed

22.

Balanuncherra

-do-

Completed

23.

Hiracherra

-do-

Completed

24.

Tilthai Halam Basti

-do-

Completed

25.

Jamtali Bari

-do-

Completed

26.

Rajkandi

-do-

On going

27.

Longai Valley Phase-II

-do-

On going

28.

Dashamanipara

-do-

On going

29.

Chichingcherra

Dhalai

Completed

30.

Katalutma

-do-

Completed

31.

Jamthum

-do-

Completed

32.

Kalyansingh

-do-

Completed

33.

Thanabul HalamPara

-do-

Completed

34.

Ramnagar

-do-

Completed

35.

North Longtharai Valley

-do-

Completed

36.

Sainya Reang Para

-do-

Completed

37.

Shibbari-Maracherra

-do-

Completed

38.

Pushparam – Pushihum Para

-do-

Completed

39.

Thanarai Para

-do-

Completed

40.

Maichaha, Nakuljoy Para

-do-

Completed

41.

Ratannagar & Tuichakma

-do-

New

42.

Rajdhar

-do-

New

43.

Jeolcherra

-do-

New

As decided by the State Govt. 15 new Projects were taken up during the year. DMs have sent Project reports. Out of 15 projects 7(seven) are existing Projects only but properly recast.

Back to menu


9. The State Govt. with the help of ADC, Rubber Board , Coffee Board and Tea Board will raise 5000 Hectares of Rubber , 500 hectares of Coffee and 1500 hectares of Tea plantations benefiting a minimum of 5000, 500 and 1500 families respectively by the year 2002.

The progress and particulars of ST beneficiaries of Rubber, Tea and Coffee based plantations are as under: -

 

Sl.
No

 Name of Deptt.

Rubber

Tea

Coffee

Area
(in ha.)

Family

Area
(in ha.)

Family

Area
(in ha.)

Family

1

2

3

4

5

6

7

8

1.

Tribal Welfare

1321.00

1321

110.48

393

98.00

350

2.

TTAADC

1529.00

1509

-

-

-

-

3.

Rubber Board

637.33

612

-

-

-

-

4.

RD

-

-

1122.84

849

-

-

5.

TRPC Ltd.

624.00

457

-

-

-

-

6.

TFDPC Ltd.

192.20

123

-

-

-

-

7.

Coffee Board/TW

-

-

-

-

50.00

32

Total: -

4303.53

4022

1233.32

1242

148.00

382

 Coffee : Preparatory steps like procurement of seeds etc. were completed for 75 ha. during this year and for 100 ha. during next year.

Tea : Nursery raised 12.00 lakhs for planting during this season. 338acres will be covered.

Rubber : Tribal Welfare Deptt. has been placed Rs.103.25 lakhs to TRPC Ltd. for planting 413 ha. during this season.

Back to menu


10. At least 50% of the MI Schemes would be taken up in tribal areas during the next four years . A minimum of 4000 ha. of irrigation potential would be created in tribal areas through MI Schemes / Pick up weirs, earthen /RCC dams etc. during the next four years.

The target and achievement of the M.I. Schemes implemented in the Tribal Areas (considering at least 50% of the total scheme) is as follows: -

Department

1999 - 2000

2000 - 2001

Achievement

Target

Achievement

1

2

3

4

PWD

1636.00 ha.

-

67.00 ha.

TTAADC

200.00 ha.

1035 ha.

-

AGRICULTURE

NIL

-

454.00 ha.

R.D.

968.05 ha.

-

995.07 ha.

TOTAL

2804.05 ha.

1035 ha.

1516.07 ha.

Back to menu


11. At least 2000 tribal youth would be assisted under self-employment programmes during the next four years.

A self employment policy to gainfully employ all unemployed youth has been announced by the State Govt. One society was also set up. NABARD in collaboration with TW Department and TSIC Ltd. drawn a schedule of training under EDP for covering 300 educated unemployed Tribal youth for a period from June to December, 2000 in (ten) batches. Duration of training for each batch is scheduled to be of 2 weeks. Accordingly as per schedule, training for 7th batch has already been completed. TW Department has so far assisted 11 (eleven) ST women @ Rs.10,000/- to each for opening individual small enterprises.

Detail on ST persons who has got assistance so far is as follows: -

Sl.No.

Name of Deptt.

1998-99

1999-2000

2000-01

1

2

3

4

5

1.

S.T.Corporation

87

178

58

2.

Industry Deptt.(PMRY)

14

44

65

3.

TIDC

-

04

-

4.

RD

6264 (IRDP)

2845 (SGSY)

876
(SGSY)

TOTAL

6365

3071

999

 

Back to menu


12. All the ST Vacancies available in the State Govt., where suitable candidates are available, would be filled up by 2002 AD.

53 Departments have furnished report on the vacancy position to GAD and a few more Departments are yet to furnish their report. Accordingly 480 posts out of 6250 vacant posts reserved for ST in different Departments have so far been filled up since announcement of the Package. GAD is monitoring the filling up of vacancies in all Departments. Registration of Graduate/Post Graduate unemployed ST youths was conducted by T.W. Department and sent to respective Departments.